Shenval

Project Information
Output: 500kW
Turbine Arrangement: 1 X vertical multi jet pelton supplied by Zeco
Gross Head: 94m
Design Flow: 900 litres/second
Penstock Length: 1.2km
Location: Glen Urquhart
Commissioned: July 2017
Private HV System: 10km of trenched cabling connecting 3 projects (totalling 1.5MW) to the National Grid