Project Information

Output: 500kW

Turbine Arrangement: 1 X vertical multi jet pelton supplied by Zeco

Gross Head: 94m

Design Flow: 900 litres/second

Penstock Length: 1.2km

Location: Glen Urquhart

Commissioned: July 2017

Private HV System: 10km of trenched cabling connecting 3 projects (totalling 1.5MW) to the National Grid