Shallain 2

Project Information
Output: 500
Turbine Arrangement: 1 X Francis turbine supplied by Zeco
Gross Head: 60m
Design Flow: 1109 litres/second
Penstock Length: 2km
Location: Loch Rannoch
Commissioned: Sep 2016
Private HV System: 6.5km of underground cabling installed with a cable plough