Project Information

Output: 500

Turbine Arrangement: 1 X Francis turbine supplied by Zeco

Gross Head: 60m

Design Flow: 1109 litres/second

Penstock Length: 2km

Location: Loch Rannoch

Commissioned: Sep 2016

Private HV System: 6.5km of underground cabling installed with a cable plough