Shallain 1

Project Information
Output: 215
Turbine Arrangement: 1 X Francis turbine supplied by Zeco
Gross Head: 71.5m
Design Flow: 430 litres/second
Penstock Length: 1.26km
Location: Loch Rannoch
Commissioned: Sep 2016
Private HV System: 6.5km of underground cabling installed with a cable plough