Project Information

Output: 215

Turbine Arrangement: 1 X Francis turbine supplied by Zeco

Gross Head: 71.5m

Design Flow: 430 litres/second

Penstock Length: 1.26km

Location: Loch Rannoch

Commissioned: Sep 2016

Private HV System: 6.5km of underground cabling installed with a cable plough