Loch Blair

Project Information
Output: 1.5MW
Turbine Arrangement: 1 X twin jet pelton supplied by Kössler
Gross Head: 260m
Design Flow: 612 litres/second
Penstock Length: 1.4km
Location: Loch Arkaig
Commissioned: Dec 2015
Private HV System: 10km of trenched cabling linking 2 projects (totalling 1.75MW) to the National Grid