Project Information

Output: 2MW

Turbine Arrangement: 1 X vertical multi jet pelton supplied by Kossler

Gross Head: 172m

Design Flow: 1450 litres/second

Penstock Length: 3km

Location: Glen Affric

Commissioned: Jul 2017

Private HV System: 11km of trenched cabling linking two projects (3.5MW total) to the National Grid