Project Information

Output: 1.5MW

Turbine Arrangement: 2 X francis turbines supplied by Gilkes

Gross Head: 106m

Design Flow: 1045 litres/second

Penstock Length: 1.4km

Location: Strathcarron

Commissioned: Sep 2017

Private HV System: