Output: 1.5MW
Turbine Arrangement: 2 X francis turbines supplied by Gilkes
Gross Head: 106m
Design Flow: 1045 litres/second
Penstock Length: 1.4km
Location: Strathcarron
Commissioned: Sep 2017
Private HV System:
Output: 1.5MW
Turbine Arrangement: 2 X francis turbines supplied by Gilkes
Gross Head: 106m
Design Flow: 1045 litres/second
Penstock Length: 1.4km
Location: Strathcarron
Commissioned: Sep 2017