Project Information

Output: 800kW

Turbine Arrangement: 1 X Turgo supplied by Gilkes

Gross Head: 110m

Design Flow: 1000 litres/second

Penstock Length: 2.2km

Location: Invergarry

Commissioned: Dec 2015

Private HV System: