Project Information

Output: 1.25MW

Turbine Arrangement: 1 X vertical multi-jet pelton supplied by Kossler

Gross Head: 137m

Design Flow: 1123 litres/second

Penstock Length: 1.8km

Location: Glen Moriston

Commissioned: Dec 2016

Private HV System: 6.5km of underground cabling installed with a cable plough