Ceannacroc – 1

Project Information
Output: 500kW
Turbine Arrangement: 1 X Turgo supplied by Gilkes
Gross Head: 88m
Design Flow: 748 litres/second
Penstock Length: 2.2km
Location: Glen Moriston
Commissioned: Nov 201
Private HV System: 6.5km of underground cabling installed with a cable plough