Project Information

Output: 2MW

Turbine Arrangement: 2 X twin jet pelton turbines supplied by Kössler

Gross Head: 217m

Design Flow: 1156 litres/second

Penstock Length: 3.4km

Location: Loch Tay

Commissioned: Sep 2016

Private HV System: Connection to the National Grid was available on the north side of Loch Tay therefore a private HV cable was installed running 1.7km beneath Loch Tay to a depth of 150m