Project Information

Output: 1.3MW

Turbine Arrangement: 2 X francis turbines supplied by Gilkes

Gross Head: 98m

Design Flow: 1755 litres/second

Penstock Length: 1.5km

Location: Invergarry

Commissioned: Jul 2016

Private HV System: