Project Information

Output: 1.5MW

Turbine Arrangement: 1 X vertical multi jet pelton supplied by Kössler

Gross Head: 146m

Design Flow: 1320 litres/second

Penstock Length: 2.55km

Location: Glen Affric

Commissioned: Jul 2017

Private HV System: 9km of trenched cabling linking two projects (3.5MW total) to the National Grid