Project Information

Output: 1000kW

Turbine Arrangement: 1 X Francis and 1 X Turgo supplied by Gilkes

Gross Head: 74m

Design Flow: 1500 litres/second

Penstock Length: 0.48km

Location: Fort Augustus

Commissioned: Dec 2013

Private HV System: